2003′ CONSTRUCTION RECORDS

no Construction Period Volume Contract Content
1 Hatch Shield Door 2003.01.15 ~

2003.02.28

4 SET Keumkang Co.,Ltd Keumkang

new construction

2 Water-Blocking Facility 2003.2.10  ~

2003.03.02

1 SET Samcheok – City Sun’s ray Museum,

Water-blocking System

3 Water-Blocking Facility 2003.2.10  ~

2003.04.30

1 SET Samcheok – City Sun’s ray Museum,

Water-blocking System

4 Water-Blocking Facility 2003.02.10 ~

2003.04.30

1 SET Samcheock Civil Museum Samcheok civil museum

Design of Water-Blocking System

5 Water-Blocking Facilities 2003.02.10 ~

2003.02.14

4 SET Busan Regional Construction

of Management Office

Chobok Bridge. Etc 3

Design of Water-blocking System

6 Design of Water-Blocking

(Seoul, Subway Line9)

2003.02.10 ~

2003.03.25

3 SET Dongil Co., Ltd Design of Station 910
7 Blast Proof Door

Blast pressure : 3 bar

2003.02.10 ~

2003.03.03

4 SET S.R.ASHOK &

ASSOCIATES

India Army
8 Construction of Blast Proof Door  & Wall 2003.02.19

~

2003.03.30

1 SET Young am Construction

co., ltd.

Histitnte of National Defence in Ahnheung
9 Door Link 2003.02.24

~

2003.03.03

3 SET Sin-il Ltd. Manufucture of Link Accessories
10 Blast Proof Door

Blast pressure : 1ton/m2

Fire rate : 2 Hr

2003.02.20

~

2003.04.30

2 SET Samsung

Engineeing Co.,Ltd.

Phu My Fertilizer Project  in Vietnam
11 Facilities & Construction of Blast Proof Door & Bullet Resistant Doors 2003.03.10

~

2003.06.30

16 SET Dongbang novoferm Ulchin Unit 5

Nuclear Power plant

12 Manufacture Installation & Construction of Bullet Resistant Window. 2003.04.01

~

2003.07.30

2 SET Samsung Corporation Ulchin Unit 5

Nuclear Power plant

13 Manufacture & Construction of Airlock Door 2003.04.08

~

2003.04.26

2 SET Daintech industries co., inc Alaboratory of Kyung Hee Uni, New construction
14 Manufacture & Installation of

Hatch Shield Door

2003.05.02

~

2003.05.31

1 SET Samcheock City Expotown Samcheok civil museum

Design of Watertight Construction

15 Blast Proof Door

Blast pressure : 3 bar

2003.06.19

~

2003.10.30

2 SET Deawoo construction

Co., Ltd

Facility construction for removing of triple hydrogen
16 Water tight Door 2003.08.19

~

2003.10.31

1 SET Model Park Co., Ltd. Model Park Co., Ltd.
17 Construction of

Secret Booth

2003.09.30

~

2003.10.29

1 SET Sunkyung

generalizer Construction

Inergy Institute New Construction
18 Maintenance work of

Water tight Door

2003.10.01

~

2003.10.31

1 SET Hyundai Construction

Co., Ltd.

Omokkyo Subway,

Maintenance work of

Water tight Door

19 ONU Box 3Point Door 2003.10.13

~

2003.10.28

10 SET Se Jin Tech Co., Ltd. Korea Telecom

Maintenavce Work

20 Blast Proof Door

Blast pressure : 3 bar

2003.10.15

~

2003.10.30

14 SET Hyundai Petrochemical Co.,Ltd. PCD

Entrance Mainterance

21 EMI Container(40’) 2003.09.08 1 SET StahlTecniks Private Limited India Army
22 EMI Shelter(20’) 2003.12.12 1 SET StahlTecniks Private Limited India Army
23 Temporary Water Tight Door 2003.12.26 1 SET Standard E&C Water tight door in pathway at Bul-Gwang subway station
24 Permanent Water Tight Door 2003.12.26 1 SET Standard E&C Water tight door in pathway at bul-gwang subway station