Gas Tight Door

t1

Wolsung Nuclear Power plant
(Air Leakage Test)
Blast proof door & Gas tight door

t2

Korean nuclear research center
Air Leak Rate
: 0.0scfm/3.0 psi

t3

NBC shelter at 00 project
Air Leak Rate
: 0.0scfm/3.0 psi

t4

NBC shelter at 00 project
Air Leak Rate
: 0.0scfm/3.0 psi

t5

Referernce of Gas tight Door
Frame District office NBC
process room

t6

Bullet reaistant Window

t7

Bullet reaistant Window

t8

ULCHIN NUCLEAR POWER PLANT 3 & 4(MCR)
Design Requirement : UL-752

t9

ULCHIN NUCLEAR POWER PLANT 3 & 4(MCR)
Design Requirement : UL-752

t10

ULCHIN NUCLEAR POWER PLANT 3 & 4(MCR)
Design Requirement : UL-752